File #: ID 26-5432    Version: 1 Name:
Type: City Council Item Status: Agenda Ready
File created: 5/19/2026 In control: City Council
On agenda: 6/1/2026 Final action: 6/1/2026
Title: Authorize the City Manager to Issue a Purchase Order to Apex Companies for the Rehabilitation and Liner Installation of Groundwater Well RO-16 in the amount of $145,000.00 - Jeffrey E. Poteet, General Manager, Water & Sewer Department.
Attachments: 1. Apex RO-16 Liner Install Proposal
Agenda Item: 7(b)
Prepared By: Jeffrey E. Poteet, General Manager, Water & Sewer
Business: Consent Agenda Item
Department: Water & Sewer
Subject:
Title
Authorize the City Manager to Issue a Purchase Order to Apex Companies for the Rehabilitation and Liner Installation of Groundwater Well RO-16 in the amount of $145,000.00 - Jeffrey E. Poteet, General Manager, Water & Sewer Department.
Body


BACKGROUND:
The City of Marco Island's South Water Treatment Plant (SWTP) utilizes a reverse osmosis (RO) membrane treatment process to treat brackish groundwater for the City's groundwater supply system. Groundwater Well RO-16, located on South Sunset Street, is a critical component of the City's water production infrastructure. In late 2025, staff observed a significant increase in the salinity levels within the well, indicating a potential integrity issue within the well casing. As a result, a purchase order was issued to Apex Companies, LLC, through its subsidiary Water Science Associates, LLC, to conduct geophysical logging and video survey investigations of Well RO-16. The investigation identified saline intrusion entering the well through a separated casing joint located approximately 156 feet below the top of casing.

To address the issue and restore the well's integrity and operational reliability, Apex submitted a proposal dated May 7, 2026, to provide hydrogeological and well remediation services, including the installation of an internal stainless-steel liner within Well RO-16. The proposed scope of work includes removal of the existing wellhead and pumping equipment, installation of approximately 160 feet of 8-inch stainless steel liner casing, cementing the liner in place, conducting post-installation video surveys, reinstalling pumping equipment, and testing the rehabilitated well to ensure proper operation.

In addition to the field work, Apex will prepare a final technical report documenting the remediation activities, caliper log and video survey resu...