File #: ID 24-4057    Version: 1 Name:
Type: New Business Status: Agenda Ready
File created: 12/31/2024 In control: Planning Board
On agenda: 1/10/2025 Final action:
Title: RESOLUTION - Site Development Plan (SDP-24-000061) for Eklcam Warehouse to construct a 7,128 square foot building, located at 805 E. Elkcan Circle, Marco Island, FL 34145 - Mary P. Holden, Planning Manager - Community Affairs/Growth Management
Attachments: 1. Resolution, 2. Staff Report, 3. Application, 4. Response Letter, 5. Warranty Deed, 6. Boundary & Partial Topographic Survey, 7. Site Development Plan, 8. Architectural Plans, 9. Pave Drain Infiltration Report & Maintenance Plan, 10. Drainage Calculations, 11. Traffic Statement & Exhibits
Agenda Item: 10(b)
Prepared By: Mary P. Holden, Planning Manager
Business: Resolution - Site Development Plan
Department: Community Affairs-Growth Management
Subject:
Title
RESOLUTION - Site Development Plan (SDP-24-000061) for Eklcam Warehouse to construct a 7,128 square foot building, located at 805 E. Elkcan Circle, Marco Island, FL 34145 - Mary P. Holden, Planning Manager - Community Affairs/Growth Management
Body


BACKGROUND:

PROJECT DESCRIPTION:

The proposal is to construct a 7,128 square foot building, with a maximum optional 1,358 square feet of mezzanine, for a potential total of 8,486 square feet. The building will be 24 feet high, not including parapets, which measure 28 feet on the north and southwest side of the building and 26 feet elsewhere. Nine on-site parking spaces are provided, which meet the code requirements. Landscape is provided pursuant to the code requirements.


FUNDING SOURCE / FISCAL IMPACT:

Applicant has paid $5,681.00 in applicable fees.


PUBLIC NOTICE REQUIREMENTS: N/A


NOTICE APPEARANCE DATE(S): N/A


RECOMMENDATION:

PLANNING BOARD ACTION

Staff recommends the Planning Board approved SDP 24-000061 with the following condition:

1. The indicated square footage on the application and the plans do not coincide. Provide accurate square footage that match the application and plans prior to Planning Board meeting on January 10, 2025.
2. If any work is requried in the adjacent right-of-way, the Owner will need to obtain a permit to perform work in the right-of-way.
3. Since parking is based on warehousing, the use may not be convereted to office/trade/contractors or other use that requires a higher parking requirement.
4. At least every ninety (90) days, the owner/developer, its successors and assigns, shall inspect and check the pervious paver/asphalt system to assess the amount of infiltration occurring to maintain a level of permeability substantially similar to that in existence at the time of initial installat...

Click here for full text