Rejection of the Lowest Bidder, R.J. Engineering Construction Corp., Under City Ordinance Sec. 2-260(a)(1) and (10), and Award of Contract to the Second Lowest Responsive and Responsible Bidder, Infinity Construction, LLC., for the Construction of the Sand Hill Shared Use Path Project for $604,603.75 - Justin Martin, P.E., Director, Public Works
Body
BACKGROUND:
The City of Marco Island continues to advance its Bicycle and Pedestrian Master Plan, adopted in 2009, and reaffirmed by Resolution 24-10, through the planned construction of an 8-foot-wide concrete pathway along Sand Hill Street, beginning at the Leland Way intersection and ending in Winterberry Drive. The project scope includes drainage improvements, exfiltration trenches to improve water quality, driveway adjustments, signage, and pavement markings.
The project was publicly advertised, and the City received eight (8) bids. The apparent low bid of $468,898.21 was evaluated in accordance with City Ordinance Sec. 2-260(a)(1) and (10), regarding contractor responsibility and capability. Following reference checks and prior performance documentation, City staff issued a Notice of Intent to Reject the low bid for failure to demonstrate responsibility/capability. Following that action, and consistent with City procurement procedures and Florida law governing the award to the lowest responsive and responsible bidder, staff proceeded to issue a Notice of Intent to Award to Infinite Construction, LLC, as the second-lowest bidder, identified as the lowest responsive and responsible bidder.
Bidder
Bid Total, including Contingency
RJ Engineering Construction Corp.
$468,898.21
Infinite Construction LLC
$604,603.75
Andrew Sitework
$619,624.00
Southern Striping Solutions, LLC (Collier Pave)
$634,251.97
On Point Contracting Company, LLC
$639,865.00
American Design Engineering Con...