Title: Authorize the City Manager to Approve Payment for Emergency Sewer Repair on North Collier Boulevard, Performed by Titan Concrete & Utilities, in the Amount of $80,824.46 - Jeffrey E. Poteet, General Manager, Water & Sewer Department
Attachments: 1. Titan Concrete & Utilities Inc. Invoice 25075, 2. Emergency Repair Consent, 3. Emergency Repair Procurement, 4. Titan Concrete & Utilities Proposal
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Agenda Item: 7(a)
Prepared By: Jeffrey E. Poteet, General Manager
Business: Consent Agenda Item
Department: Water and Sewer
Subject:
Title
Authorize the City Manager to Approve Payment for Emergency Sewer Repair on North Collier Boulevard, Performed by Titan Concrete & Utilities, in the Amount of $80,824.46 - Jeffrey E. Poteet, General Manager, Water & Sewer Department
Body


BACKGROUND:
On June 23, 2025, a partial blockage was identified in a 4-inch sanitary sewer lateral along North Collier Boulevard. The obstruction, composed primarily of grease and unidentified debris, was located within the asphalt on the western side of the roadway median, between two landscaped island medians. The sewer lateral lies approximately seven feet below the surface.

Due to the depth of the pipe and the complexity of the necessary excavation and repair, the City engaged Titan Concrete & Utilities - an approved underground utility contractor under the City's Continuing Services Contract - to perform the emergency repair.

Given the groundwater conditions at the site, well points and dewatering pumps were required to safely lower the water table and allow for effective repair operations. The scope of work completed by Titan Utilities included the following:

* Installation of well points and dewatering equipment
* Implementation of a Maintenance of Traffic (MOT) plan and lane closure
* Asphalt removal to access the affected sewer lateral
* Replacement of the damaged section of the 4-inch sewer pipe
* Placement of flowable fill for proper bedding and support
* Installation of temporary steel roadway plates to restore traffic flow
* Final milling and paving for permanent roadway restoration

In accordance with Section 2-258 of the City's Purchasing and Procurement Policy, when the City Manager determines that an emergency exists posing an imminent threat to public health, safety, or welfare - and when any delay would be detrimental - the City Manager is authorized to initiate ...