Legislation Details

File #: ID 24-3652    Version: 1 Name:
Type: New Business Status: Agenda Ready
File created: 5/30/2024 In control: Planning Board
On agenda: 6/7/2024 Final action: 6/7/2024
Title: RESOLUTION - Site Development Plan (SDP-23-000398) for a New Commercial Center consisting of approximately 6,268 square feet located at 588 Bald Eagle Drive, Marco Island FL 34145
Attachments: 1. Resolution, 2. Staff Report, 3. Application, 4. Boundary & Topographic Survey, 5. Site Development Plans, 6. Elevations

Agenda Item: 10(c)

Prepared By: Mary P. Holden, Planning Manager

Business: Resolution - Site Development Plan

Department: Community Affairs - Growth Management

Subject:

Title

RESOLUTION - Site Development Plan (SDP-23-000398) for a New Commercial Center consisting of approximately 6,268 square feet located at 588 Bald Eagle Drive, Marco Island FL 34145

Body                     

 

 

BACKGROUND: 

 

PROJECT DESCRIPTION:

 

The proposed Site Development Plan (“SDP”) is for a new commercial center, consisting of approximately 6,268 square feet, that will contain a restaurant with drive through, offices, and retail space.  In conjunction with the SDP, a variance is being requested to the landscape buffer width for the south and west side of the property where it abuts the Marco Island Cemetery.  Attached are application, plans, elevations, and boundary survey related to the SDP.

 

 

FUNDING SOURCE / FISCAL IMPACT: 

 

The applicant has paid $5,613.40 in applicable fees.

 

 

PUBLIC NOTICE REQUIREMENTS: N / A

 

 

NOTICE APPEARANCE DATE(S): N / A

 

 

RECOMMENDATION: 

 

STAFF RECOMMENDATION

 

Staff recommends the Planning Board approve SDP 23-000398 with the below conditions:

 

Conditions of approval:

 

1.                     Approval of the variance to landscape buffers is required. If the variance is not approved, this SDP is null and void.

2.                     The maximum height of the light pole, including the base, is eighteen (18’) feet for vehicular areas and fourteen (14’) feet for pedestrian areas.

3.                     The parking matrix must be revised to reflect the correct totals.

4.                     Signs are reviewed and approved through a separate process; however, signs must be setback fifteen (15’) feet from the property line. The current location as shown on the site plan is not compliant with the City’s code. The sign locations must be revised.

5.                     Prior to constuction, provide a new environmental survey identifying listed/protected wildlife that is completed no more than 90 days prior to submittal of the building permit application.

 

Constructed related Conditions:

6.                     Replace 18" perforated rcp for tripe wall corrugated polypropylene pipe. junction boxes are not needed, and add pipe details in cross-sections

7.                     Indicate in the plan if the existing flume is to be relocated.

8.                     Add exfiltration swale on Bald Eagle Drive. Add detail in cross-sections

9.                     Provide the calculation for the proposed water quality volume.

10.                     Include details of the r/w exfiltration swale in the cross-section

11.                     Include details of the 18" storm pipe in the cross-section

12.                     Wastewater hydraulic study is needed.

13.                     Show irrigation meter and size.

14.                     Provide sizing calculations for grease trap.

 

 

POTENTIAL MOTION:  

 

Move to approve Resolution 24-XX with the listed conditions.