Skip to main content
File #: ID 24-3457    Version: 1 Name:
Type: Ordinance Status: Second Reading
File created: 2/21/2024 In control: City Council
On agenda: 3/18/2024 Final action: 3/18/2024
Title: Ordinances - First Reading (Continued from the February 20, 2024 Meeting) - Consideration and Transmittal of Amendments to Comprehensive Plan 2040, Incorporating by Reference the Ten-Year Water Supply Facilities Work Plan and Eliminating Infrastructure Element Policy 1.1.1.1, and (by separate ordinance) Amending the Future Land Use Map - Mary P. Holden, Senior Planner, Community Affairs/Growth Management
Attachments: 1. Ordinance 24-08 Ten Year Water Supply, 2. Ordinance 24-09 Future Land Use Map, 3. Staff Report, 4. Ten Year Water Supply Work Plan, 5. Notice of Publication - Ordinance 24-08, 6. Notice of Publication - Ordinance 24-09

Agenda Item:  11(B)1

Prepared By:  Mary P. Holden, Planning Manager

Business: Ordinance - First Reading

Department:  Community Affairs-Growth Management

Subject:

Title

Ordinances - First Reading (Continued from the February 20, 2024 Meeting) - Consideration and Transmittal of Amendments to Comprehensive Plan 2040, Incorporating by Reference the Ten-Year Water Supply Facilities Work Plan and Eliminating Infrastructure Element Policy 1.1.1.1, and (by separate ordinance) Amending the Future Land Use Map - Mary P. Holden, Senior Planner, Community Affairs/Growth Management

Body                     

 

 

BACKGROUND

Before you today are three proposed amendments to the City’s adopted 2040 Comprehensive Plan in two separate ordinances.  The first two amendments (addressing the Ten-Year Water Supply Facility Plan and removal of Infrastructure Policy 1.1.1.1.), will be in one ordinance and the amendment to the Future Land Use Map will be in the other ordinance.  This report will cover both ordinances.

The first amendment relates to the City’s Ten-Year Water Supply Facilities Work Plan, which is incorporated by reference in the Comprehensive Plan.  The proposed amendments will change the identified Comprehensive Plan objectives and policies only by inserting the date of the Ten-Year Water Supply Facility Work Plan.

Future Land Use Element, Policy 5.1.1

Infrastructure Element, Objective 1.1

Infrastructure Element, Policy 1.1.1

Infrastructure Element, Objective 1.2

Please note that Section 163.3177(6)(c), Florida Statutes requires each local government to address in its comprehensive plan water supply sources necessary to meet and achieve the existing and projected water use demand. State law also requires local governments to prepare and adopt “Ten Year Water Supply Facilities Work Plan” (or the “Water Plan”) and amend their comprehensive plans to incorporate the Water Plan by reference.

Cities within the SFWMD are required to revise their plan within 18 months after approval of the Lower West Coast Water Supply Plan update. The South Florida Water Management District’s (SFWMD) Governing Board adopted the “Lower West Coast Water Supply Plan Update” in December 2022. 

The second amendment is to eliminate the Infrastructure Element, Policy 1.1.1.1. “The City of Marco Island will update its Ten-Year Water Supply Facilities Work Plan in accordance with Florida Statues no later than March 31, 2022.” since this policy has been met.  It was added during the Comprehensive Plan update when it was discovered the Ten-Year Water Supply Facilities Work Plan was outdated.

The third amendment proposed is a change to our Future Land Use map for 415 Lily Court (Marco Island Utilities) and 1340 Lily Court (LCEC Substation) from Low Density Residential to Community Facility.  These two sites have operated as a water treatment facility and electrical substation for many years and do not anticipate this area converting to low density residential.  The designation of these two lots as low density residential was missed during the Comprehensive Plan update.

 

PLANNING BOARD SUMMARY AND RECOMMENDATION:

The Planning Board held a public hearing and discussed both ordinances at their February 2, 2024, meeting.  There was minimal discussion, no public comment and the Board voted on the two ordinances separately.  The Planning Board voted 7-0 to forward a recommendation of approval for the adoption of the Ten-Year Water Supply Facilities Plan and elimination of Infrastructure Element, Policy 1.1.1.1.

The Planning Board voted 6-1 to forward a recommendation of approval for the amendment to the Future Land Use Map indicating 415 and 1340 Lily Court as Public Facilities.

 

 

PUBLIC NOTICE REQUIREMENTS: 

 

Ordinance 24-08 and Ordinance 24-09:  F.S. 163.318 (11)(a):  Two advertised public hearings.  The first public hearing shall be held at least 7 days after the day that the first advertisement is published.  The second hearing shall be held at least 10 days after the first hearing and shall be advertised at least 5 days prior to the public hearing.  Ad will run as a display ad, no less than 2 col x 10 inches.

 

ADVERTISED DATES:  2/27/2024

 

 

FUNDING SOURCE / FISCAL IMPACT:  N / A

 

 

RECOMMENDATION

 

Approve Ordinances 24-08 (Ten Year Water Supply) and 24-09 (Future Land Use Map) on first reading.

 

 

POTENTIAL MOTION:  

 

Move to approve the Ordinances 24-08 (Ten Year Water Supply) and 24-09 (Future Land Use Map) on first reading.