Legislation Details

File #: ID 26-5364    Version: 1 Name:
Type: City Council Item Status: Agenda Ready
File created: 4/22/2026 In control: City Council
On agenda: 5/4/2026 Final action:
Title: Reappropriation of General Fund Reserves and Award of Contract to Capital Contractors LLC. for Winterberry Beach Access Boardwalk Repairs in the Amount of $347,750.00. - Joe Parrilli, Director, Fleet & Facilities
Attachments: 1. 24-8200 Capital Contract FE, 2. Winterberry Beach Access Replacement R02, 3. Winterberry Beach Access Demo Mat R02
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Agenda Item: 16(a)

Prepared By: Joe Parrilli, Director, Fleet & Facilities

Business: City Council Item

Department: Fleet & Facilities

Subject:

Title

Reappropriation of General Fund Reserves and Award of Contract to Capital Contractors LLC. for Winterberry Beach Access Boardwalk Repairs in the Amount of $347,750.00. - Joe Parrilli, Director, Fleet & Facilities

Body                     

 

 

BACKGROUND

The Winterberry Beach access boardwalk, located at the corner of Winterberry Drive and South Collier Boulevard, sustained damage during Hurricane Ian.

Both proposals include the necessary demolition of the current structure, site setup, and permitting/coordination services. Below is a summary of the two replacement strategies:

 

Option 1: Full Boardwalk Replacement

Total Estimate: $849,400.00 This option focuses on a complete structural replacement within the existing footprint.

                     Foundation & Framing: Installation of new driven timber pile foundations, cap beams, and stringer framing using treated lumber.

                     Decking: High-quality composite decking with marine-grade hardware.

                     Accessibility: Includes the construction of a new ADA-accessible switchback ramp and the refurbishment/reinstallation of existing handrails.

 

Option 2: Mobi-Mat System Installation

Total Estimate: $347,750.00 This option provides a grade-level alternative utilizing a Mobi-Mat walkway system.

                     Earthwork: Delivery and compaction of approximately 996 CY of fill to create a 300 LF graded alignment.

                     Specifications: A 10-foot wide finished walking surface with 4:1 side slopes.

                     Environmental: Includes silt fence installation for erosion control and landscaping of new slopes with approximately 100 cordgrass plants.

 

FUNDING SOURCE / FISCAL IMPACT

The project will be funded through reappropriated funds from the City’s General Fund Reserves. The current estimated FEMA reimbursement is approximately $35,000 if project is reconstructed as is, with potential for adjustment post-completion.

 

PUBLIC NOTICE REQUIREMENTS: NA

 

NOTICE APPEARANCE DATE(S): NA

 

RECOMMENDATION

Staff recommend reappropriating funds from the General Fund Reserves to complete necessary repairs to Winterberry Beach Access Option 2 and award of contract to Capital Contractors LLC. in the amount of $347,750.00.

 

POTENTIAL MOTION:  

“I move to award the contract to Capital Contractors LLC Option 2 in the amount of $347,750.00 for Winterberry beach access repairs and authorize the City Manager to execute the necessary documents.”